«CURQUISH» Hydropower Project

This run of the river project will be built upstream of the existing CAHUA hydro plant, using hydro resources from the Huayllapa & Pumarinri rivers (part of Pativilca River Basin), the intakes will be located at 3,600 & 3,610 m.a.s.l. respectively, with 9 km of conduction tunnels, and the power house will be built in a cavern with two Peltom units with a total height of 705 meters. The project does not need facilities to regulate its energy production. The project plans to have an installed capacity of 88 MW and an estimated annual energy production of 439 GWh.

     

Baseline Scenario

Which emissions are the proposed Clean Development Mechanism CDM project displacing?
«CURQUISH» Project is a medium scale CDM project and will displace GHG emitted by thermal power plants using diesel, residual (bunker), carbon and natural gas as fuel from the national grid.
What would the future look like without the proposed CDM project?
We foresee that the new capacity added to the grid in the future will be basically thermal power plants burning natural gas in combined cycle plants, which will replace most of the other plants operating with oil, coal and other fossil fuels. National policies, energy sector policies and the new natural gas exploitation of «Camisea» lead to particular circumstances that tend to foster thermal technology against hydro-developments.
What would the estimated total greenhouse gas (GHG) reduction be with the project?
According to the Consolidated Methodology ACM0002, the World Bank Carbon Finance Business in a study done in December 2004 got a Baseline Emission Factor of 544 tCO2e/gwh. Using that emission factor it is expected that «CURQUISH» project will displace around 238,816 tCO2e/year which otherwise will be emitted by thermal power with diesel, residual (bunker), coal and natural gas.

Current Status

Earliest project start date
The preliminary design was complete on December 2004; the geologic study including field test & investigation will finish in August 2005, then the final design & feasibility analysis will be finished in December 2005.
Estimate of time required before becoming operational
We plan to complete the project in June 2010.
What is the project lifetime?
50 years
Current status or phase of the project eg: which of the following phases have been completed:
• Energy and water concession for studies have been already given.
• Cahua’s board approved go ahead with the final design & feasibility studies.

Estimated Emission Reductions

Annual: an average of 238,816 tCO2e

• Up to and including 2012: 358,224 tCO2e
• Up to a period of 7 years: 1,671,712 tCO2e
• Up to a period of 10 years: 2,388,160 tCO2e
• Up to a period of 14 years: 3,343,424 tCO2e

 

Project Benefits

• 2,000 indirect jobs during construction works.
• The project would create new jobs, promote sustainable development of the surroundings of the project (local communities) and in general shall contribute to the economic growth to a big portion of the country by supplying more clean and cheap energy through the interconnection of the project to the national grid.
• Displace around 238,816 tCO2e/year which otherwise will be emitted by thermal power with diesel, residual (bunker), coal and natural gas
• Increase the participation of the hydro-power generation in the Peruvian electricity demand.

Project Participant and Financing

Total project cost estimate:
• Development cost: US$ 4,370,000
• Equipment cost: US$ 28,470,000
• Civil works: US$ 40,838,000
• Total project costs: US$ 73,678,000

Sources of finance to be sought or already identified:
• Equity: US$ 15,000,000 (shareholders and other investors, to be determined before completion of feasibility analysis)
• Debt: US$ 58,678,000 through project finance/capital markets (local or foreign, to be determined before completion of feasibility analysis)
• Carbon finance contribution sought: As much as we can have in advance.


Contact Information:

Developer: CAHUA Sociedad Anónima (CAHUA SA)
CDM promoter: National Environmental Fund (FONAM)
Name: Julia Justo, Claudia Monsalve, Tania Zamora
Phone/Fax Numbers: (51-1) 449-6200
E-mail: jjusto@fonamperu.org / cmonsalve@fonamperu.org
tzamora@fonamperu.org / fonam@fonamperu.org